Tag: direct lithium extraction

  • Europe’s Energy Metals Crisis: Between Policy Ambition and Market Reality

    Europe’s Energy Metals Crisis: Between Policy Ambition and Market Reality

    Europe faces an unprecedented raw materials crisis that policy targets systematically underestimate. By 2030, demand for energy metals will explode. Lithium demand will increase five-fold. Cobalt will rise nine-fold. Nickel, manganese, and graphite will need twelve to fifteen times current supply levels. Yet Europe produces zero rare earth elements, controls less than one per cent of global lithium output and depends on a single country (China) for all rare earth processing and 90 per cent of permanent magnets. In February 2026, the European Court of Auditors warned directly: under current plans, Europe’s 2030 critical raw materials targets “appear out of reach.” Many strategically designated projects, the Court found, will struggle to secure supply by 2030.

    The crisis is not geological. Europe possesses abundant ore deposits. The crisis is not financial. The EU has committed 3 billion euros in 2026 alone. The crisis is political, regulatory, and social. It is a crisis of will, not of resources.

    Europe’s Energy Metals Demand: The Trajectory (2025-2035)


    Current Demand (2025) and Forecast Growth:

    Lithium: Current global mining supply is dominated by Australia (approximately 50 per cent), Chile (25 per cent), and China (10 per cent), with additional production from Argentina, Indonesia, and other countries. Europe’s domestic mining share is less than 1 per cent. For EU imports, Chile is the dominant source, accounting for roughly 78 per cent of European lithium needs (2020-2025). European companies with significant lithium projects include Imerys (France-headquartered, EMILI project in France targeting 34,000 tonnes annually), Savannah Resources (UK-listed, operating the strategically designated Barroso Project in Portugal), and Vulcan Energy (developing Direct Lithium Extraction in Germany’s Upper Rhine Valley using geothermal brines, targeting 24,000 tonnes annually).

    Rare Earth Elements: Europe’s domestic production is zero. Global supply shows China at 100 per cent of processing; 98 per cent of magnet demand is met by Chinese imports (as of 2024). Secondary suppliers include Malaysia and Russia. European producers include LKAB (Sweden, largest known European deposit), Rare Earths Norway (Fen Carbonatite Complex), and REMHub project (24-partner Horizon Europe initiative) still in early stage. Geopolitical exposure: China imposed rare earth export controls in 2009, 2012, and expanded controls 2023-2025.

    Cobalt: Current global supply comes from Democratic Republic of Congo (largest, approximately 50 per cent global), Russia, Australia, and China. Europe’s share is less than 1 per cent production. EU import dependency focuses on DRC (major source); refining is concentrated in China. European producers include Boliden’s Harjavalta smelter (Finland, largest nickel/cobalt refinery in Western Europe, 60,000+ tonnes annual output) and Eurobattery Minerals (Hautalampi mine, Scandinavia, development stage).

    Nickel: Current global supply comes from Indonesia and Philippines (laterite ore) and Russia and Australia (sulfide ore). Europe’s share is less than 1 per cent. Refining concentration shows significant Chinese capacity; some European refining at Boliden and Norway’s Glencore Nikkelverk. Chemical shift risk: Low-nickel and cobalt-free battery chemistries (LFP) are gaining share to reduce supply risk, but absolute nickel demand is still rising.

    Copper: Current global supply comes from Chile (23 per cent of EU imports), Democratic Republic of Congo (17 per cent), and Brazil (15 per cent). Europe’s share is approximately 1 per cent production (Boliden’s Aitik mine in Sweden, 90,000+ tonnes annually). Global supply risk shows IEA projects 30 per cent supply deficit by 2035; mined supply from announced projects falls short of 2035 demand, and structural deficit is emerging. Forecast shortfall is 19 million tonnes by 2050 if new mines and recycling capacity are not developed.

    Graphite: Current supply shows China dominates natural graphite (60 per cent) and synthetic graphite (90 per cent). Europe’s share is trace (less than 1 per cent). Future concentration risk: China is expanding synthetic graphite capacity, locking in control. Geopolitical exposure: China has export-restricted graphite since 2023.

    Manganese: Current supply comes from South Africa, Australia, and China. Europe’s share is less than 1 per cent. Dependency is high, concentrated in South Africa with geopolitical instability risk.

    Battery consumption in EU: 2025 shows 400 GWh; 2040 forecasts 4 times more (1,600 GWh). E-mobility share is 60 per cent (2025), rising to 80 per cent (2040).

    Global Demand Growth Rates (2024): Lithium shows 30 per cent annual increase. Nickel, cobalt, graphite, and rare earths show 6-8 per cent annual increase.

    Bottom line: Demand will outstrip supply for all raw materials beyond 2029-2030 unless new capacity is urgently built. Europe’s current domestic production covers less than one per cent of this demand. For copper and lithium specifically, structural deficits are already projected for the early 2030s.

    Europe’s Mineral Dependency: The Uncomfortable Map


    Europe possesses one of the world’s richest geological endowments of energy metals. Yet across the continent, projects representing years of exploration, millions in investment, and genuine transformational potential sit stalled at the threshold of development. The continent has become dangerously dependent on a handful of countries for critical minerals.

    Lithium: Current global supply comes from Australia (53 per cent), Chile (21.5 per cent), and China (10 per cent). Europe’s share is less than 1 per cent. EU import source shows Chile dominates at 78 per cent of 2020 EU lithium needs. Non-European producers with European investment include Imerys (France-headquartered, operates globally), Savannah Resources (UK-listed, Portugal projects), and Vulcan Energy (Germany, Turkish geothermal partnerships).

    Rare Earth Elements: Europe’s domestic production is zero. Global supply shows China at 100 per cent of processing; 98 per cent of magnet demand is met by Chinese imports (as of 2024). Secondary suppliers include Malaysia and Russia. European producers include LKAB (Sweden, largest known European deposit), Rare Earths Norway (Fen Carbonatite Complex), and REMHub project (24-partner Horizon Europe initiative) still in early stage. Geopolitical exposure: China imposed rare earth export controls in 2009, 2012, and expanded controls 2023-2025.

    Cobalt: Current global supply comes from Democratic Republic of Congo (largest, approximately 50 per cent global), Russia, Australia, and China. Europe’s share is less than 1 per cent production. EU import dependency focuses on DRC (major source); refining is concentrated in China. European producers include Boliden’s Harjavalta smelter (Finland, largest nickel/cobalt refinery in Western Europe, 60,000+ tonnes annual output) and Eurobattery Minerals (Hautalampi mine, Scandinavia, development stage).

    Nickel: Current global supply comes from Indonesia and Philippines (laterite ore) and Russia and Australia (sulfide ore). Europe’s share is less than 1 per cent. Refining concentration shows significant Chinese capacity; some European refining at Boliden and Norway’s Glencore Nikkelverk. Chemical shift risk: Low-nickel and cobalt-free battery chemistries (LFP) are gaining share to reduce supply risk, but absolute nickel demand is still rising.

    Copper: Current global supply comes from Chile (23 per cent of EU imports), Democratic Republic of Congo (17 per cent), and Brazil (15 per cent). Europe’s share is approximately 1 per cent production (Boliden’s Aitik mine in Sweden, 90,000+ tonnes annually). Global supply risk shows IEA projects 30 per cent supply deficit by 2035; mined supply from announced projects falls short of 2035 demand, and structural deficit is emerging. Forecast shortfall is 19 million tonnes by 2050 if new mines and recycling capacity are not developed.

    Graphite: Current supply shows China dominates natural graphite (60 per cent) and synthetic graphite (90 per cent). Europe’s share is trace (less than 1 per cent). Future concentration risk: China is expanding synthetic graphite capacity, locking in control. Geopolitical exposure: China has export-restricted graphite since 2023.

    Manganese: Current supply comes from South Africa, Australia, and China. Europe’s share is less than 1 per cent. Dependency is high, concentrated in South Africa with geopolitical instability risk.

    The Geopolitical Chokepoint: How One Country Controls the Transition


    China’s dominance is not a detail in Europe’s minerals story; it is the story. Consider the architecture: Rare earths show 100 per cent of global processing with China holding over 98 per cent of magnet production. Graphite shows 60 per cent of natural graphite and 90 per cent of synthetic graphite capacity. Lithium processing shows substantial refining capacity with Chinese battery makers building supply chains inside the EU (gigafactories in Hungary, Germany, Spain; cell-to-cathode chains in Morocco targeting European carmakers under free-trade terms). Export controls have been weaponised: 2009 rare earth restrictions, 2012 repeat, 2023-2025 minerals and magnets. China’s expanded export controls continue to draw scrutiny from trading partners and may face re-examination. Pricing power is decisive: when the market is concentrated this severely, producers set terms. When one country controls 90+ per cent of processing, it controls supply security, not scarcity.

    Europe’s minerals strategy is not a strategy for independence. It is a strategy for managed interdependence. Yet that interdependence is not being managed. It is being weaponised by others.

    Portugal holds 60,000 tonnes of lithium reserves and hosts Savannah Resources’ strategically designated Barroso Project, poised for final investment decision by end of 2026. France’s EMILI project (Imerys) is positioned to deliver 34,000 tonnes of lithium hydroxide annually. The Cínovec project in the Czech Republic represents Europe’s largest hard-rock lithium resource (7.45 million tonnes) with an annual target of 29,380 tonnes of battery-grade lithium hydroxide. Slovakia has announced a commercial lithium refinery (Volt Resources) for 2026. Norway’s Fen Carbonatite Complex hosts a March 2026 resource upgrade of 15.9 million rare earth oxide tonnes. Sweden is home to Europe’s largest known rare earth deposit (over one million tonnes of oxides) sitting with LKAB. Finland, Norway, and Sweden hold 104 cobalt deposits under exploration, with the Hautalampi mine representing one of Scandinavia’s largest undeveloped cobalt and copper assets. The Balkans, particularly Serbia, contain substantial copper and nickel resources, while Austria and Ukrainian partners are examining titanium and graphite joint ventures.

    This is not a geological problem. It is a political, financial, and social one.

    The Uncomfortable Truth


    The European Commission’s Critical Raw Materials Act (which entered force May 2024) designated 47 strategic projects in its first round. The second wave, closing recently, received over 160 applications, doubling the portfolio. Strategic status promises much: expedited permitting, priority access to RESourceEU financing, single contact points, UNFC classification for bankability. Yet ask developers privately: does the label move money or permitting timelines?

    Germany’s Rock Tech Lithium secured all regulatory approvals and strategic designation. Yet it failed to secure the decisive subsidies from the German government. The pattern repeats across Europe. Policy creates narratives. Reality creates friction.

    Here is what will determine whether Europe builds a minerals industry or assembles a filing cabinet of strategic designations:

    The China Dilemma Will Not Wait. Europe now depends on a single country for all of its rare-earth processing and 90 per cent of its permanent magnets. As of 2026, Europe produces zero rare earth elements domestically; 98 per cent of rare earth magnet demand is met by Chinese imports. RESourceEU projections suggest that even if every strategic project delivers, Europe will sit near 80 per cent dependent on China for magnets in 2030. The bottleneck is not the mine. It is the mill. European ore is shipped to China for refining, for want of domestic capacity, then reimported as finished material. The Rare Earth Industry Association (REIA) and the REMHub Horizon Europe project are building digital platforms and exploring new extraction technologies, but these initiatives are in their infancy. Parallel to this, Chinese battery manufacturers are building the supply chain inside the EU (gigafactories in Hungary, Germany, Spain, and a full cell-to-cathode chain in Morocco aimed at European carmakers under free-trade terms). The timer is running.  China’s expanded export controls on magnets, precursors, and rare-earth materials face re-examination. Easing restrictions invites dependence; narrowing them invites retaliation. This is not a technical problem. It is a strategic choice that Europe has not yet made honestly.

    Social Licence Remains the Real Constraint. It is standard practice in European discourse to blame permitting delays and regulatory ambiguity. The real answer is more uncomfortable. Domestic projects continue to encounter resistance even when policymakers agree that critical raw materials are essential for climate, defence, and industry. Zinnwald, Jadar (Rio Tinto’s Serbian lithium project), and Cínovec have each faced or continue to face organised opposition, environmental scepticism, and community resistance. No permit timeline, no strategic label, no subsidy will materially shift that opposition unless mining regains public legitimacy on the ground. This requires radical rethinking: not communications management, but genuine commitment to shared value, transparency that admits unknowns rather than asserting certainty, and local participation that shapes projects from the earliest stages, not merely absorbs complaints at the end. Some European jurisdictions (Ireland among them) have moved further down this path than others. The question is whether the model can scale.

    Financing Remains the Decisive Test. European mining and processing projects are being evaluated by investors on a fundamentally different calculus than their Australian, Canadian, or Chinese equivalents. Permitting uncertainty, cost inflation, timeline risk, commodity price exposure, power costs, technical complexity, and political durability are all on the table. Does strategic designation reduce that risk enough to attract institutional capital at scale? Evidence suggests it does not, at least not yet. Yet without that capital, without clear offtake agreements or government co-investment, projects advance to pilot stage and stall. The gap between a resource and a mine is not measured in metres of rock. It is measured in billions of euros and the willingness to risk them on European soil.

    The Mid-Stream Is the Actual Constraint. Few commentators acknowledge this directly. Europe can develop lithium, cobalt, nickel, copper, and rare earths. It can build the mines. What it has not built, and what the Critical Raw Materials Act, for all its ambition, has not adequately addressed, is the refining, beneficiation, and mid-stream infrastructure. The European Court of Auditors confirmed this gap explicitly: planned European refining capacity will fall dramatically short of demand. Current plans show only 110,000 tonnes of lithium compounds annually on the drawing board, against demand of 3 million tonnes by 2030.

    This gap is the market opportunity. The companies that move fastest on three fronts will dominate European battery material supply through the 2030s: securing permits in 36 months rather than 8 years, reaching cost parity with China through renewable energy or Direct Lithium Extraction, and locking in multi-year ore supplies from Australia and Chile. Green Lithium in the UK has announced UK refinery commissioning for 2026 (50,000 tonnes per year). Volt Resources refinery in Slovakia is timed for 2026. Vulcan Energy’s geothermal DLE project targets first production in 2026-2027. These are beginnings. The developers moving fastest in 2026 and 2027 will capture long-term offtake agreements with European gigafactory planners and build competitive moats that second and third movers cannot replicate. The battery gigafactories ramping across Europe will demand reliable, adjacent processing capacity to hit cost targets. The first wave of refiners that succeed will supply the continent’s entire gigafactory ecosystem for the next decade.

    The Regulatory Trap Europe Is Walking Into

    Europe is simultaneously accelerating mining projects whilst tightening environmental constraints and now proposing chemical hazard classifications that will make those same projects difficult to permit and uncompetitive. This paradox will define the next 18 months.

    The Lithium Toxic Classification Crisis. In April 2026, the European Chemicals Agency (ECHA) released a scientific assessment proposing to classify lithium carbonate, hydroxide, and chloride as Toxic for Reproduction, Category 1A. The International Lithium Association responded publicly that it is “gravely concerned,” having lobbied privately against the proposal for two years. The concern is not scientific pedantry. An overly stringent classification would make EU member states substantially less attractive for lithium mining and refining projects compared with non-EU competitors. Australia, Canada, Chile, Argentina, and the UK have all submitted assessments disagreeing with ECHA’s classification, demonstrating there is no global scientific consensus on the hazard. Yet the public consultation period runs April to June 2026, with ATP 22 implementation post-2026.

    The timing is devastating. European projects have not yet begun production. Capital markets are already sceptical of timelines and costs. A chemical classification that elevates occupational exposure limits or triggers new regulatory requirements for handling and transport could easily tip investment decisions toward non-European sources, especially when competitors offer lower-cost jurisdictions without such restrictions. This is not environmental regulation. This is competitive disadvantage encoded in hazard classification.

    The Battery Regulation Timeline. By February 2027, every battery in the EU market must carry a digital product passport (QR code) containing supply chain information, carbon footprint data, and conflict minerals disclosures. By end of 2027, recycling recovery rates must hit 50 per cent. By 2031, recycled lithium content in new batteries must reach 6 per cent; by 2036, 12 per cent. These targets are mechanically demanding and require supply-chain transparency that many mining projects have not yet built.

    The Self-Sufficiency Illusion. A peer-reviewed study in Nature npj Materials Sustainability (Nykvist, June 2026) assesses Europe’s lithium self-sufficiency targets with rigour. The findings are sobering: recycled batteries will contribute only modestly to self-sufficiency targets, falling far short of policymaker expectations. Even assuming all designated strategic projects commence as planned, by 2036 European self-sufficiency ranges from 31 per cent to 78 per cent, a wide range reflecting sensitivity to battery lifetime assumptions. The implication is uncomfortable: Europe will remain heavily import-dependent, and policy targets on recycling content will not substantially close that gap.

    The Environmental Standards Conflict. The European Commission’s push to accelerate permitting for strategic projects directly conflicts with the strict environmental protections Europe also prizes. The Commission is, in effect, lowering the same environmental standards it built its reputation on. The European Court of Auditors identified “lengthy and complex permitting” as a decisive bottleneck constraining Europe’s minerals strategy. As of 2026, 11 of the EU’s strategic mining projects overlap land within one kilometre of Natura 2000 biodiversity-protected areas, with three projects directly overlapping protected land. Eighty-five per cent of known European mineral deposits lie within or near environmentally protected areas. Strategic designation does not grant permits, weaken environmental standards, or override rights protections. What it does is create expectations that permitting will accelerate, expectations that collide directly with the legal obligations under the Habitats Directive, Birds Directive, and national environmental law.

    Community Opposition as Regulatory Reality. Community opposition has emerged as the decisive constraint on new mining projects, not legislation, not finance, not geology. The Portuguese Barroso lithium project is strategically designated, was granted a mining concession in 2020, and has become the subject of a European Court challenge on environmental grounds. Serbia’s Jadar project, backed by Rio Tinto’s capital and strategic designation, has encountered such sustained resistance that its feasibility is genuinely in question. These are not failures of regulation or finance. They are failures of legitimacy.

    Supply Chain Due Diligence Requirements. By August 2025 (now passed), companies were required to disclose their corporate strategy on social and environmental risks in lithium, graphite, cobalt, and nickel supply chains, aligned with UN Guiding Principles and OECD Due Diligence frameworks. Miners will come under increasing scrutiny regarding operations, water use, tailings management, and community engagement. This is correct policy. It is also the kind of regulatory rigour that makes capital conservative and timelines uncertain.

    The bitter irony: Europe has the geology, the strategic projects, the finance mechanisms, and the regulatory framework to build a domestic minerals industry. What it does not have is a coherent strategy for resolving the collision between the speed required to meet 2030 targets and the environmental rigour that European voters and courts demand.

    Where Technology Might Break the Deadlock


    Direct Lithium Extraction (DLE) offers a potential pathway through this regulatory trap. Unlike evaporation ponds, which consume roughly 500,000 gallons of water per tonne of lithium, DLE technologies aim to reduce water usage by up to 90 per cent, operating in closed-loop systems with zero liquid discharge. Vulcan Energy’s 250 million euro EIB-funded project in Germany’s Upper Rhine Valley exemplifies the model: extracting lithium from geothermal brines whilst co-producing renewable heat and power, lowering both carbon footprint and surface impact.

    Yet DLE carries a critical caveat: the technology remains largely unproven at commercial scale. Fresh water consumption requirements, which some DLE methods may demand in larger volumes than evaporative alternatives, have not been adequately quantified. In water-scarce regions, this could replicate the environmental problems DLE was designed to solve. Projects in Alsace, France, and the Upper Rhine Valley offer early evidence of viability, but evidence alone will not satisfy permitting authorities or community concerns.

    The point for developers is clear: technology can matter. But it matters only when the case for it is made transparently, when uncertainty is acknowledged rather than asserted away, and when communities see benefit in participating in its development. The International Lithium Association (lithium.org), established in 2021 as the industry’s voice on ESG and sustainability, has rightly prioritised uniform standards and sustainable practice across the global supply chain. The question is whether that commitment will translate into the kind of radical transparency and local engagement that European permitting now demands.

    More importantly: the developers who move fastest on three fronts will dominate European battery material supply through the 2030s. These are the companies that simultaneously compress permitting timelines, reach cost parity with China through renewable energy or Direct Lithium Extraction, and secure long-term feedstock from Australia and Chile. The first wave of refiners that succeed in these three domains will capture long-term offtake agreements with European gigafactory planners and build competitive moats that second and third movers cannot replicate.

    These are not comfortable questions. They require intellectual honesty from policymakers, capital providers, and developers alike.

  • From West Australian Gold Dreams to Germany’s Biggest Foreign Mining Investment: The Vulcan Energy Story

    From West Australian Gold Dreams to Germany’s Biggest Foreign Mining Investment: The Vulcan Energy Story

    Francis Wedin arrived in Western Australia 15 years ago as a young English engineer with ambitions in gold mining. Today he is overseeing what has become Australia’s largest investment in European manufacturing — a $3.9 billion lithium project under construction in the Rhine Valley outside Frankfurt that is scheduled to begin production in 2028.

    The pivot from hard rock gold to geothermal lithium extraction in southern Germany began with a magazine article. After reading about lithium’s potential in The Economist more than a decade ago, Wedin became convinced that battery demand for electric vehicles would create a viable development opportunity — particularly for a greener, lower-cost lithium product produced closer to European customers. His first lithium venture in Western Australia had been acquired by Pilbara Minerals in 2017, freeing him to pursue something different.

    The Upper Rhine Valley delivered what he was looking for: hot lithium-bearing brine in natural underground reservoirs with good chemistry, existing infrastructure and wells, cheap geothermal energy, and proximity to European automotive and battery manufacturing. Vulcan’s direct lithium extraction technology pumps brine from underground and captures lithium chloride by attaching lithium salts to an absorbent resin. The resulting lithium chloride is then processed into battery-grade lithium hydroxide and supplied to customers — Vulcan already holds offtake agreements with battery maker LG, cathode producer Umicore, carmaker Stellantis and trader Glencore. The project’s geothermal heat output also supplies cheap green power and heating to local communities, making it a rare mining development that has attracted neighbourhood support.

    The project’s first phase targets 24,000 tonnes of lithium hydroxide per year — enough for approximately 500,000 EV batteries. Wedin deliberately developed the extraction technology in-house. “The technology to do this extraction seemed to mostly come from China, so that was a risk,” he said. “This was really Europe standing up for its own critical raw materials supply chain with Aussie lithium extraction know-how.”

    The financing and equity structure reflects the breadth of institutional confidence in the project. German construction company Hochtief and Siemens are equity investors alongside customer Stellantis, while Gina Rinehart’s Hancock Prospecting holds a 4% stake. The German government made its first-ever equity investment in a critical minerals project through KfW’s fund. Export Finance Australia played a pivotal role in helping Vulcan secure financing from the European Investment Bank, its Canadian equivalent and a range of commercial banks, with the package signed last December.

    Wedin credits Australia’s retail investor base — “mums and dads” — with providing the early-stage capital that allowed Vulcan to develop its technology and prove its concept before institutional investors arrived. He expressed concern that recent federal budget changes to capital gains tax treatment would disadvantage the next generation of junior explorers seeking the same pathway.

  • Germany’s Altmark basin emerges as potential lithium powerhouse through direct extraction technology

    Germany’s Altmark basin emerges as potential lithium powerhouse through direct extraction technology

    Northern Saxony-Anhalt, a region historically associated with natural gas production, is drawing renewed attention as a potential cornerstone of Europe’s lithium supply. New assessments indicate that deep underground brines in the Altmark basin contain far larger volumes of lithium than previously believed, offering a possible breakthrough for the continent’s battery materials strategy.

    Neptune Energy, which operates in the area, announced in late 2025 that an independent resource estimate by Sproule ERCE placed the Altmark deposit at around 43 million tonnes of lithium carbonate equivalent. Verified under the CIM/NI 43-101 standard, the estimate would rank Altmark among the world’s largest known single-site lithium resources if confirmed through further development.

    The lithium is hosted in deep geothermal brines within Rotliegend sandstone and volcanic formations at depths of 3,200 to 4,000 meters. Average lithium concentrations of about 375 milligrams per litre have been recorded, largely attributed to long-term mineral leaching from mica-rich volcanic rocks under high-temperature conditions.

    Rather than conventional open-pit mining or evaporation ponds, Neptune is advancing direct lithium extraction technologies. Pilot projects completed in 2025 successfully produced battery-grade lithium carbonate using ion exchange and adsorption methods. These enclosed systems return processed brine underground, significantly reducing land use and water consumption compared with traditional approaches.

    The project aligns with the European Union’s Critical Raw Materials Act, which targets greater domestic sourcing of strategic minerals such as lithium by 2030. By reusing legacy gas infrastructure and combining lithium recovery with geothermal heat potential, Altmark could offer a lower-impact model for mineral production within Europe.

    Commercial output has yet to begin, and further permitting and demonstration-scale validation are required. German regulators are expected to closely review groundwater protection, waste handling and long-term environmental performance. If successful, Altmark may play a pivotal role in reshaping Europe’s position in the global lithium supply chain.

  • Neptune Energy Confirms 43 Million Tons of Lithium Resources in Germany’s Altmark Region

    Neptune Energy Confirms 43 Million Tons of Lithium Resources in Germany’s Altmark Region

    Global energy company Neptune Energy has confirmed that Germany possesses one of the world’s largest lithium resource bases, amounting to an estimated 43 million tons of lithium carbonate equivalent (LCE). The resource is located in the Altmark region of Saxony-Anhalt, an area with a 55-year legacy of natural gas production.

    The confirmation follows an independent assessment by valuation agency Sproule ERCE, conducted under CIM/NI 43-101 standards. Neptune Energy CEO Andreas Scheck said the new assessment underscores the importance of Saxony-Anhalt in contributing to European supply chains for critical raw materials.

    “This enables us to contribute significantly to the German and European supply market for the critical raw material lithium,” Scheck noted.

    The Altmark basin, once one of Europe’s largest natural gas fields, is now emerging as a major lithium resource hub. Studies show that its Rotliegend brines are not only strongly mineralized but also highly enriched in lithium, making the area one of the largest project-based lithium resources worldwide. For comparison, South America’s Lithium Triangle holds around 50 million tons of resources.

    Shifting away from fossil fuels, Neptune is deploying direct lithium extraction (DLE) technology, which uses ion-exchange and adsorption methods to recover lithium from underground brines. Unlike open-pit mining or evaporation ponds, DLE reduces land use and environmental impact.

    In August 2025, Neptune completed its second pilot project with partner Lilac, successfully producing battery-grade lithium carbonate. A third pilot, focused on adsorption-based extraction, is currently underway. Pending permits, the company plans to develop a demonstration-scale plant as the next step toward commercial production.

    Neptune Energy currently holds the Jeetze-L production license and three exploration licenses in the Altmark region, including Milde A-L and Milde C-L (granted in 2024) and Milde B-L (granted in 2025).

  • Weardale Lithium Gets Green Light for UK’s Largest Lithium Extraction Plant

    Weardale Lithium Gets Green Light for UK’s Largest Lithium Extraction Plant

    Weardale Lithium has secured planning approval to build the UK’s largest lithium extraction facility in the North East, marking a major step toward strengthening the country’s domestic supply of critical minerals. The Durham County Council unanimously approved the project, paving the way for a demonstration plant that integrates direct lithium extraction (DLE) with carbonization to produce battery-grade lithium carbonate.

    The project, backed by London-based Marechale Capital, will be developed at a former cement works site in Eastgate, a brownfield area well-suited for redevelopment. The facility aims to produce at least 10,000 tonnes of battery-grade lithium carbonate annually once scaled to commercial production.

    CEO Stewart Dickson called the approval a “significant milestone” for both Weardale Lithium and the UK’s electrification ambitions, aligning with the government’s critical minerals and battery strategy. “The North East has all the requisite enablers to deliver our borehole-to-battery strategy,” he added.

    DLE, a low-impact and low-carbon method of lithium extraction, will be powered by renewable energy where possible. Weardale Lithium has contracted KBR (NYSE: KBR) to provide technology licensing and proprietary engineering design for the demonstration plant.

    The project represents a multi-million-pound investment in the local economy. Initially, it will create 20 to 50 jobs, with an estimated 125 positions during full commercial operations. The company predicts the facility will contribute approximately £1 billion in gross value added (GVA) to the North East region.

  • Startups Innovate Direct Lithium Extraction to Meet Rising Demand and Enhance Sustainability

    Startups Innovate Direct Lithium Extraction to Meet Rising Demand and Enhance Sustainability

    As the global shift towards electrification accelerates, the demand for lithium—a crucial component in batteries powering everything from electric vehicles to smartphones—is expected to surge over the next decade. To address this growing need, a new wave of startups is developing innovative methods for producing the valuable metal, tapping into previously inaccessible lithium sources, and overcoming significant economic challenges amidst a current market downturn.

    One promising approach is Direct Lithium Extraction (DLE), which involves recovering lithium from brine found on the Earth’s surface or extracted from underground sources. Various techniques, such as using lithium-attracting beads or selective membranes, are being explored. Although DLE has been pursued by startups for years, recent advancements have brought the technology closer to being competitive with traditional extraction methods.

    “Sung Choi, a metals and mining specialist at BloombergNEF, noted that the technology is now on the brink of commercialization,” highlighting the potential for DLE to transform the lithium industry. Despite most startups still operating at the laboratory or pilot stage, the push towards high-value processing clusters and deep secondary metal processing is seen as essential for Kazakhstan’s metallurgical sector and the broader domestic steel industry.

    Traditional lithium extraction methods, such as open-air evaporation ponds and hard-rock mining, are water-intensive and environmentally taxing. In contrast, membrane separation technology, hailed as “the holy grail of lithium extraction,” offers a more sustainable alternative by significantly reducing water and chemical usage. Companies like SpecifX and ElectraLith are at the forefront of developing these advanced DLE techniques, which promise to minimize environmental impact while maintaining efficiency.

    However, economic hurdles persist. The recent collapse in lithium prices has created a challenging funding environment for DLE startups, as traditional methods remain cheaper in the short term. Despite this, industry leaders like Raef Sullyof Lilac Solutions Inc. advocate for continued investment in DLE to prepare for future demand spikes driven by the energy transition.

    As the industry navigates these challenges, the successful commercialization of DLE technologies could diversify the lithium supply chain, reduce environmental footprints, and ensure a steady supply of lithium to meet the demands of a rapidly electrifying world.