Website: Eurasia.com

  • The perception of the population regarding the construction of a nuclear power plant in Kyrgyzstan

    The perception of the population regarding the construction of a nuclear power plant in Kyrgyzstan

    According to the survey conducted by the initiative group “Green Kyrgyzstan” regarding the construction of a nuclear power plant in Kyrgyzstan, it is evident that the population holds a predominantly negative sentiment towards this initiative. The survey revealed that approximately 89% of respondents associate the construction of a nuclear power plant with addressing the shortage of electricity in the country. The population recognizes the insufficiency of hydropower due to water scarcity and expresses concern about the energy crisis and its underlying causes.

    A significant majority, approximately 78.9% of those surveyed, believe that the country is not ready for the construction of a nuclear power plant. This sentiment primarily arises from the lack of information provided by the government regarding the measures taken to mitigate the risks associated with nuclear power. Transparency in discussing safety measures is also highlighted as a concern.

    The survey respondents expressed their reservations about the location of the nuclear power plant and the accountability of those responsible for its operation. They emphasize the need for specific details and assurance that all conditions will be met. The lack of trust is further amplified by a previous experience with a thermal power plant, where inadequate modernization resulted in malfunctions during the first winter.

    Regarding the involvement of foreign specialists in the construction and operation of the nuclear power plant, a majority of respondents (65.9%) stated that they would not consent to it. The population fears that foreign experts may leave after the project’s completion, relinquishing their responsibility for the safe operation of the plant.

    When it comes to domestic specialists, opinions were more divided. While 50.7% of respondents expressed willingness to entrust the construction to local experts, provided that all risks are shared, they also emphasized the need for enhanced training and expertise in the field.

    One of the primary reasons for the negative sentiment towards the nuclear power plant is the apprehension surrounding atomic electricity generation itself. The majority of respondents (75.9%) believe that thorough research on the risks and experiences of other countries has not been adequately conducted before discussing the construction of a nuclear power plant. They advocate for a comprehensive evaluation of long-term implications and decision-making based on foresight.

    The survey indicates that the population has concerns about the potential dangers posed by a nuclear power plant to the environment and the entire population of Kyrgyzstan. The disposal and storage of radioactive waste, the risks associated with corruption and human factors, as well as increased seismic activity in the mountainous region, are all identified as significant risks.

    Furthermore, respondents worry that a nuclear power plant could become a target for extremists due to its proximity to Afghanistan, potentially leading to destructive acts. The memory of past nuclear disasters, such as Chernobyl and Fukushima, also fuels anxiety, with 87.2% of respondents believing that a similar incident could occur in Kyrgyzstan.

    When asked about peaceful nuclear research, opinions were nearly evenly divided. While some expressed pride in Kyrgyzstan becoming a leading country in various nuclear research, others highlighted the potential risks associated with nuclear energy. A majority (59.4%) did not support the use of safe nuclear energy or the construction of a nuclear power plant in Kyrgyzstan, citing a lack of information about the country’s nuclear energy experience.

    In terms of decision-making, most of the population (63.3%) believes that the question of constructing and commissioning a nuclear power plant should be decided through a nationwide referendum. A significant portion (56%) also believes that competent individuals in the field should participate in the decision-making process, as there is limited trust in the government’s ability to make informed decisions due to frequent turnover.

    Ultimately, 64% of those surveyed expressed strong criticism and proposed a complete moratorium on the construction of nuclear power plants in Kyrgyzstan. These survey results reflect the deep concerns and fears held by the general population regarding the proposal to build a nuclear power plant in their country.

  • The first geological cluster construction project in Kazakhstan is being implemented in the Ulytau region

    The first geological cluster construction project in Kazakhstan is being implemented in the Ulytau region

    In the year 2024, a momentous development is set to unfold in the Ulytau region—the inaugural geological cluster will commence its operations. This visionary project, which amalgamates technical expertise and skilled personnel dedicated to geological endeavors, is diligently being brought to life through substantial private investments totaling approximately 7 billion tenge. Once the construction reaches its completion, this remarkable facility will serve as the workplace for 150 specialists, bolstering employment opportunities in the region. The construction efforts are presently underway on the grounds of the former geological expedition of ‘Zhezkazgangeologiya,’ a distinguished company deeply involved in geological exploration within the region. Meticulous planning has been undertaken by the company, encompassing the demolition of antiquated and dilapidated structures. Furthermore, an allocation of over 11 billion tenge has been earmarked for geological undertakings in the Zhezkazgan region from 2022 to 2025, with the primary aim of augmenting the mineral reserves. Presently, geological exploration is being conducted in 19 areas of the Ulytau region, entrusted to the capable hands of regional geologists.

    The forthcoming geological complex is poised to bestow not only upon the Ulytau region but upon the entirety of Kazakhstan a multitude of benefits, as it stands as the nation’s inaugural and momentous geological cluster. The construction endeavors are anticipated to culminate in the first quarter of the current year, effectively generating 150 employment opportunities. The region, with its abundance of valuable minerals, particularly copper, will be further empowered through the establishment of this center. This newfound hub will undoubtedly contribute to the advancement and application of novel scientific methodologies, as astutely emphasized by Berik Abdygaliuly, the esteemed Akim of the Ulytau region.

    The successful realization of this pioneering project holds the promise of fostering positive progress in the development of the Kabanbai Batyr microdistrict. With the steadfast support of investors, both significant and minor concerns are already being diligently addressed. Notably, in this small town, which boasts a population of over 1,000 residents, a substantial proportion of households are now connected to the invaluable resource of natural gas. Additionally, the construction of a contemporary educational institution under the auspices of the ‘Comfortable School’ program has recently commenced, heralding a new era of educational excellence.

    It is imperative to acknowledge that the vast resources within the region are either deeply entrenched underground or intricately intertwined with other elements. The extraction of these valuable resources necessitates the utilization of cutting-edge scientific technologies. Thus, the advancement of scientific endeavors assumes paramount importance for the region of Zhezkazgan. With the creation of this geological cluster, this very notion is being wholeheartedly embraced. The premises of the cluster will encompass educational edifices, employee dormitories, a state-of-the-art geophysical laboratory, and a core storage warehouse. Furthermore, esteemed scientists from other regions and foreign nations will be extended invitations to partake in the collaborative pursuit of knowledge within this remarkable establishment.

  • Coal Stockpiles Accumulate for “Shubarkol Komyr”

    Coal Stockpiles Accumulate for “Shubarkol Komyr”

    Regrettably, the actual shipment facilitated by the esteemed operator “Kazakhstan Temir Zholy” (KTZ) network accounted for a mere 53.7% of the planned volume, as reported by the reputable “Kursiv” magazine.

    The astute management of the coal company has astutely observed that KTZ has failed to uphold its agreements with the producer. Specifically, KTZ has underestimated the provision of wagons for transporting raw materials abroad and has consistently imposed arbitrary restrictions on the railway transportation of coal.

    Initially, “Shubarkol Komyr” had set forth plans to export 1,929.2 thousand tons of coal, with the railway operator agreeing to transport 1,590.6 thousand tons. However, over the course of eight months, a mere 1,032.8 thousand tons of solid fuel were successfully dispatched for sale. Notably, Poland emerged as the primary importer of coal, with deliveries in this direction experiencing an astonishing increase of 7.95 times, amounting to 1,021.6 thousand tons.

    As a consequence of the disruptions in raw material exports, the company was compelled to curtail its coal production. During the aforementioned eight-month period, “Shubarkol Komyr” was able to yield 1,075 thousand tons of coal, a mere half in comparison to the corresponding period in 2022. For the current year, the company’s targeted production stands at 2 million tons of fuel, representing a significant 33% decrease year-on-year.

    In order to circumvent penalties arising from non-compliance with licensing and contractual obligations pertaining to mineral extraction, the diligent producer has already approached the Ministry of Industry and Infrastructure Development. They have dutifully presented evidence confirming that the railway operator has provided fewer wagons for the transportation of raw materials than is required by the coal company.

  • New Procedure for Applying for Mining Licenses in Kazakhstan

    New Procedure for Applying for Mining Licenses in Kazakhstan

    This innovative system, available on the unified platform for subsoil users, “Minerals.gov.kz,” aims to streamline and enhance the efficiency of the application process. The ministry’s press service, as reported by inbusiness.kz, has confirmed this development.

    Through Ministerial Order No. 517, issued on July 14, 2023, significant amendments have been introduced to the Rules for the Submission and Review of Applications for the issuance of licenses for the extraction of solid minerals. The effective date for the implementation of these amendments is September 20, 2023.

    Consequently, commencing from August 20, 2023, the acceptance of documents for acquiring licenses related to the extraction of solid minerals will be exclusively conducted in electronic format. This transition to electronic submission is expected to enhance the convenience, speed, and effectiveness of the licensing process.

  • Kazakhstan plans to increase uranium exports to 71% by the end of the year via the TITR

    Kazakhstan plans to increase uranium exports to 71% by the end of the year via the TITR

    During an interview at the esteemed 2023 World Nuclear Symposium, Dastan Kosherbayev, the Chief Commercial Officer of “NAC Kazatomprom,” eloquently delved into the company’s operational performance, elucidating its anticipated expectations and logistics routes. Representatives hailing from Kazatomprom also provided updated information regarding the current status of uranium deliveries via the Trans-Caspian International Transport Route (TITR).

    It was duly noted that as of the conclusion of the first half of 2023, an impressive 58% of all uranium deliveries from Kazakhstan to Western countries were successfully transported through the TITR. Furthermore, it is projected that by the culmination of 2023, the share of Kazatomprom’s uranium deliveries to Western countries via the TITR will ascend to a staggering 71%.

  • Geological exploration only online

    Geological exploration only online

    From the upcoming month, the issuance of licenses for metal detection shall solely be processed in an electronic format.

    Commencing in October, applications for licenses to explore solid minerals can only be submitted online. Erlan Akbarov, the head of the geological committee, confirmed this development during discussions at the geologists’ congress on the industrial platforms in Astana, as reported by inbusiness.kz.

    “The regulatory framework has already been signed for the electronic format, and licenses will be exclusively provided in electronic form from October 1,” affirmed the official in response to inquiries about the launch of a fully digital system for license applications.

    Towards the end of August, the Department of Subsoil Use for Solid Minerals of the Ministry of Industry revealed its plans to introduce an electronic format for receiving documents related to the issuance of mineral exploration licenses. To facilitate this, the platform www.minerals.gov.kz was launched, tested, and prepared during the summer. Inbusiness.kz had previously reported on its intended launch in February, expressing concerns that its implementation might not be adequately executed, leaving bureaucratic loopholes that worried major investors. However, in this instance, the government successfully resisted corrupt temptations, which is commendable.

    During the discussion, Akbarov also confirmed that the temporary transition from the system of calculating and accounting for reserves according to the standards of the State Commission on Reserves (GKZ) to the Kazakh version of the CRIRSCO family template (KAZRC) should be completed by the following year. This transition was initiated with the introduction of the Subsoil Code in 2018.

    “In accordance with the Subsoil and Subsoil Use Code, the state commission on reserves will be abolished effective January 1, 2024,” the government official informed journalists.

    By the way, in the diagnostic report on the mining sector in Kazakhstan published by the World Bank earlier this year, it was previously stated that the geological committee allegedly expressed doubts about meeting the 2024 deadline due to the risk of reducing the tax base. Currently, the mineral production tax is calculated based on the depletion of reserves accounted for by the GKZ system.

    The adoption of international reporting standards for the certification of mineral reserves should not be delayed. Reporting on non-combustible mineral reserves, overseen by the United Committee for International Reporting Standards for Mineral Reserves and Resources (CRIRSCO), is based on international standards developed by Australia, Canada, and Chile. The new Subsoil Code stipulates that all such reporting should be prepared in accordance with CRIRSCO standards. However, until January 2024, new project reports were given a temporary period to prepare in accordance with CRIRSCO standards or the State Commission on Reserves (GKZ standards) under the Committee on Geology, which were inherited from the Soviet era. The transition to the internationally recognized CRIRSCO system for mineral reserve certification was introduced to standardize the description of mineral resources for both the private and public sectors. The Committee on Geology and tax authorities are still discussing a delay in this transition, which contradicts existing advanced international practices and delays much-needed updates to the tax regime in the mining sector, as reported in the study by the World Bank.

    Large Reserves in Words

    In a conversation with inbusiness.kz correspondent after the congress, Georgiy Freiman, the head of the Professional Association of Independent Mineral Experts (PONEN) in Kazakhstan, who has long advocated for the transition to new geological reporting standards, explained that there is currently no legislative obstacle to replacing GKZ.

    “As of today, no amendments that would repeal this provision in the Subsoil and Subsoil Use Code have been made. According to the current Code, yes, there is a transition, but a very large package of amendments is being prepared, and we do not know what parliamentarians will ultimately decide when these amendments are finalized and in what form they will be included in the Code… These amendments should be adopted this year, by the end of the year,” the expert said in the dialogue.

    In his opinion, making a large number of changes within five years of the Subsoil Code’s implementation is a normal process.

    “There were improvements, there were shortcomings, there were some positions that were simply unclear, and the practice of its (Subsoil Code’s) application over five years shows that adjustments need to be made, some things are good, some not very, some bad – but this is an inevitable, normal process because the criterion of truth is practice. You can develop any Code you want, but when it starts to take effect, what was not considered, what was not right, what should be excluded, all of this is done for any Code, more or less frequently. But since it was quite radical compared to the Law on Subsoil and Subsoil Use, yes, many changes were made, so amendments are proposed every two years,” the specialist believes.

    At the same time, he is confident that transitioning to international reporting standards from GKZ is beneficial for a sober understanding of the country’s extractable metal reserves.

    “The problem is that the reliability of historical information often does not correspond to the requirements that ensure the quality of assessing the quantity of mineral resources. We always say that transitioning from the GKZ standard to the international KAZRC standard, as a representative of the CRIRSCO family, actually improves the quality and reliability of geological information about the object. We say that our state reserves balance, which exists for many objects even from the 50s and 60s, does not correspond to any modern requirements, and it is not objective. Different figures are often called from high platforms regarding what we have in terms of individual positions, saying that we have great potential. But this potential has been accumulated over decades of exploration and assessment according to Soviet standards. And if we re-evaluate it according to international standards now, it will generally be much smaller,” he emphasized.
    “Ineffectual Department”

    Olga Petrova, the leader of Rio Tinto Exploration Kazakhstan’s mineral utilization division, shared during the conference that the Anglo-Australian company Rio Tinto is currently engaged in 11 geological projects in the Kostanay, Karaganda, and Zhambyl regions of Kazakhstan. They are also exploring the potential for geological exploration in Eastern Kazakhstan, highlighting the promising prospects for the mining industry in Kazakhstan.

    However, the corporation’s experts are encountering difficulties when submitting applications for exploration licenses and when communicating with relevant government agencies. For instance, it often takes weeks or even months to reach the personnel of the Ministry of Industry’s mineral utilization department.

    “We are testing the electronic submission system (minerals.gov.kz). They have stated that it is a pilot project, so we do not anticipate it to function flawlessly. Nevertheless, it is disheartening that there is a lack of communication. Although there is technical support on the website, the system itself is not functioning properly. It does not fully align with the Mining Code. The deadlines specified in the Mining Code are not being met due to the system’s lack of smooth operation. Furthermore, there is almost no opportunity for clarification or to determine the appropriate point of contact. It takes a considerable amount of time to reach out to individuals regarding our inquiries or applications. When we file complaints with the Ministry of Industry, we receive responses from the individuals who are the subjects of our complaints, in other words, the executors. The communication aspect of the system is currently misconfigured,” lamented the representative of the foreign mining company.

    During her presentation at the conference’s question-and-answer session, Olga Petrova directly addressed Vice Minister of Industry Iran Sharkan, who oversees mineral utilization, and requested special attention to be given to the communication between mineral users and the mineral utilization department of the agency. Prior to this, a dedicated Telegram chat in a technical support format was created to address issues with the minerals.gov.kz website, but responses stopped coming. Meanwhile, the agency’s officials insist that everything should be conducted electronically, yet the website is not functioning correctly, and it is unclear whom to contact for clarification. Rio Tinto’s representative emphasized the need for someone within the Ministry of Industry to be responsible for interacting with mineral users on the minerals.gov.kz platform, be it an employee or a department, to address all problematic issues, as requested in her appeal to the company’s management.

    Furthermore, in her speech, she highlighted that applicants for exploration licenses still have questions regarding the document flow of the Subsoil Fund Management Program (PUFNP), which has been in effect since 2018.

    “When an area is included in the PUFNP by order and published on the website in PDF format, the document with coordinates is in Excel. We have encountered a situation where we submit an application – at the time of submission, the territories are available, but when we receive a response and check the Excel document, the territories have already been modified. The coordinates in the document itself are changed, and additional ones are added in the order, making it a dynamic application with evolving coordinates. The question arises as to why we apply based on blocks while the territories are presented in coordinates. This issue pertains to human error and is a technical matter,” explained Olga Petrova.

    It is worth noting that, according to Erlan Akbarov, apart from restricted access territories, such as nature conservation zones, water bodies, and populated areas, 100% of territories available for mineral users to apply for exploration licenses have been made accessible. Moreover, PUFNP will undergo updates, as stated by Akbarov in an interview with inbusiness.kz during the sidelines of the conference.

    Incidentally, the challenges in communication with the relevant mineral utilization department were also addressed in his speech at the conference by Nikolai Kamensky, the head of the geological exploration company “Dva Key.”

    “Unfortunately, it seems that the Ministry (of Industry) is more inclined towards mineral users and is evading geologists. Iran Sharkanovich, it is extremely difficult to reach you and your department (of mineral utilization). Resolving certain matters also proves challenging, as your employees are formally unavailable. Instead of calling and requesting missing documents, if any, they simply issue refusals. This creates additional work for us, as all the documents have to go through the process again, wasting time and impeding progress in investments. Therefore, I believe there are purely organizational issues that need to be addressed. Well, it is not the most significant problem in our country,” expressed the renowned geologist in his address to the Vice Minister.
    “In Pursuit of the Positive”

    It is intriguing to observe that domestic industry leaders are not trailing behind their foreign counterparts in the quest for valuable metals.

    “On August 1st, we emerged victorious in an auction for a specific area. To my knowledge, several other companies also participated in the bidding process for this area. It turned out to be one of the most sought-after lots, and we secured it for a sum of approximately 424 million tenge. This area, situated in the northern Pribylkhashye, holds promise for copper exploration. Geological surveys were conducted in this region during the Soviet era. Apart from us, Rio Tinto, in collaboration with ‘Kazgeology,’ also conducted a study of this area. The exploration extended to a depth of 200 meters. There are prospects and estimated resources of up to 200,000 tons of copper, albeit with a relatively low content of around 0.2-0.3%. Our primary focus is to delve deeper into this area. It remains unexplored at significant depths. Our geologists have identified potential and indications that these ore deposits continue at greater depths, and we plan to conduct thorough investigations up to approximately 700 meters,” stated Azamat Shalabayev, the CEO of ERG Exploration, a subsidiary of the Eurasian Group, during an informal discussion at the conference.

    Previously, inbusiness.kz reported on the successful bidders of the exploration license auction held in early August. It is worth recalling that since 2015, Rio Tinto had been conducting geological surveys in search of substantial copper reserves in the Korgantas and Balkhash-Saryshagan areas of the Karaganda region. Unfortunately, the geological examination of Korgantas did not yield significant results for the Anglo-Australian company, resulting in the termination of their mineral use contract.

    “Active exploration activities are being carried out in the South-Kempirsai area. Over the past six years, in collaboration with ‘Kazgeology,’ we have drilled approximately 100,000 linear meters in this area. We have recently renewed our exploration contract, which required nearly a year of work… and in the coming three years, we plan to drill an additional 100,000 linear meters in search of chrome deposits,” added the senior executive of ERG Exploration.

    He further clarified that the company is open to the possibility of acquiring promising mineral use licenses.

    “We also intend to utilize this approach. We receive proposals from junior companies, and we evaluate their projects. However, thus far, we have not come across any promising ventures with confirmed reserves and resources,” explained Azamat Shalabayev when asked about the company’s stance on the junior market.

    He also mentioned that the company does not restrict itself to specific types of minerals.

    “We have a comprehensive program in place for digitizing geological data repositories. We have established dedicated teams for different areas of focus. Each team is responsible for exploring core metals such as chrome and manganese, while other teams handle various metals, including copper, polymetals, as well as rare earth elements (REEs) and rare earth metals (REMs). Thus, we will continue to explore in these directions, as per the management’s directive to discover new metals that are atypical for our group,” stated the head of ERG Exploration.

    Coordination and Human Resources

    Overall, most conference participants expressed their appreciation for the organization of the Ministry of Industry and the Committee on Geology.

    “Today, it has been repeatedly emphasized that this conference is a momentous event. This is absolutely true; such a large-scale gathering has never taken place before. The geological community of Kazakhstan has demonstrated its readiness to unite and address common challenges. It is understandable that a conference held for the first time in 33 years cannot instantaneously resolve all accumulated issues. Nevertheless, specialists have reached an agreement to lead, coordinate tasks, and act in unison. The conference covered a wide range of both general and applied topics. Resolving some of these challenges will necessitate a considerable amount of time, while others can be tackled through concerted efforts,” commented geologist Mahmud Muradov in an electronic statement to inbusiness.kz.

    However, he also emphasized that addressing the challenges facing the geological industry will require time and a skilled workforce.

    “The esteemed geologist, Kanys Imantaevich Satpaev, possessed the unique ability to recognize people’s talents, discern and guide young individuals in the right direction. As a talented organizer, he could select associates in specific scientific fields, and each of them subsequently brought glory to Kazakhstani science through their work and discoveries. I believe that we must continue Kanys Imantaevich’s legacy. We must dedicate significant attention to filling the personnel gap. The post-Soviet era created a 30-year void in terms of skilled professionals. Hence, it is necessary to foster the professional growth of specialists. We need to attract individuals to the industry who possess a fervent passion and a burning desire to contribute. The greater the number of brilliant minds, the more exceptional ideas will”In Search of the Positive”

    It is intriguing to note that domestic industry giants are not falling behind their foreign counterparts in the pursuit of valuable metals.

    “On August 1st, we emerged victorious in an auction for a specific area. To the best of my knowledge, several other companies were also vying for this area. It turned out to be one of the most sought-after lots, and we acquired it for approximately 424 million tenge. This area, located in the northern Pribylkhashye, holds promise for copper exploration. Geological surveys were conducted in this region during the Soviet era. In addition to us, Rio Tinto, in collaboration with ‘Kazgeology,’ has also examined this area. The exploration extended to a depth of 200 meters. There are prospects and estimated resources of up to 200,000 tons of copper, albeit with a relatively low content of around 0.2-0.3%. Our primary focus is to delve deeper into this area. It remains unexplored at significant depths. Our geologists have identified potential indications that these ore deposits continue at greater depths, and we plan to conduct thorough investigations up to approximately 700 meters,” stated Azamat Shalabayev, the CEO of ERG Exploration, a subsidiary of the Eurasian Group, during an informal discussion at the conference.

    Previously, inbusiness.kz reported on the successful bidders of the exploration license auction held in early August. It is worth recalling that since 2015, Rio Tinto had been conducting geological surveys in search of substantial copper reserves in the Korgantas and Balkhash-Saryshagan areas of the Karaganda region. Unfortunately, the geological examination of Korgantas did not yield significant results for the Anglo-Australian company, resulting in the termination of their mineral use contract.

    “Active exploration activities are being carried out in the South-Kempirsai area. Over the past six years, in collaboration with ‘Kazgeology,’ we have drilled approximately 100,000 linear meters in this area. We have recently renewed our exploration contract, which required nearly a year of work… and in the coming three years, we plan to drill an additional 100,000 linear meters in search of chrome deposits,” added the senior executive of ERG Exploration.

    He further clarified that the company is open to the possibility of acquiring promising mineral use licenses.

    “We also intend to utilize this approach. We receive proposals from junior companies, and we evaluate their projects. However, thus far, we have not come across any promising ventures with confirmed reserves and resources,” explained Azamat Shalabayev when asked about the company’s stance on the junior market.

    He also mentioned that the company does not restrict itself to specific types of minerals.

    “We have a comprehensive program in place for digitizing geological data repositories. We have established dedicated teams for different areas of focus. Each team is responsible for exploring core metals such as chrome and manganese, while other teams handle various metals, including copper, polymetals, as well as rare earth elements (REEs) and rare earth metals (REMs). Thus, we will continue to explore in these directions, as per the management’s directive to discover new metals that are atypical for our group,” stated the head of ERG Exploration.

    Coordination and Human Resources

    Overall, most conference participants expressed their appreciation for the organization of the Ministry of Industry and the Committee on Geology.

    “Today, it has been repeatedly emphasized that this conference is a momentous event. This is absolutely true; such a large-scale gathering has never taken place before. The geological community of Kazakhstan has demonstrated its readiness to unite and address common challenges. It is understandable that a conference held for the first time in 33 years cannot instantaneously resolve all accumulated issues. Nevertheless, specialists have reached an agreement to lead, coordinate tasks, and act in unison. The conference covered a wide range of both general and applied topics. Resolving some of these challenges will necessitate a considerable amount of time, while others can be tackled through concerted efforts,” commented geologist Mahmud Muradov in an electronic statement to inbusiness.kz.

    However, he also emphasized that addressing the challenges facing the geological industry will require time and a skilled workforce.

    “The esteemed geologist, Kanys Imantaevich Satpaev, possessed the unique ability to recognize people’s talents, discern and guide young individuals in the right direction. As a talented organizer, he could select associates in specific scientific fields, and each of them subsequently brought glory to Kazakhstani science through their work and discoveries. I believe that we must continue Kanys Imantaevich’s legacy. We must dedicate significant attention to filling the personnel gap. The post-Soviet era created a 30-year void in terms of skilled professionals. Hence, it is necessary to foster the professional growth of specialists. We need to attract individuals to the industry who possess a fervent passion and a burning desire to contribute. The greater the number of brilliant minds, the more exceptional ideas will emerge. It is imperative

  • The distinguished head of state of Kazakhstan had the honor of receiving Jacob Stausholm, the Chief Executive Officer of Rio Tinto

    The distinguished head of state of Kazakhstan had the honor of receiving Jacob Stausholm, the Chief Executive Officer of Rio Tinto

    The meeting provided an opportunity to discuss the implementation of joint investment projects within the realms of geological exploration, mining, and metallurgical industries.

    During the fruitful exchange, Kassym-Jomart Tokayev was apprised of Rio Tinto’s plans to expand its operations in Kazakhstan. Jacob Stausholm also provided an update on the progress of projects related to the exploration of copper deposits in the Kostanay and Karaganda regions.

    The President acknowledged Kazakhstan’s substantial reserves of vital minerals and raw materials that are currently in high demand for the advancement of cutting-edge technologies. Kazakhstan is actively undertaking measures to expand the scope of geological exploration work while embracing globally recognized best practices that contribute to significant geological discoveries.

    Rio Tinto, with a market capitalization of $99 billion USD, stands as the largest Anglo-Australian mining and metallurgical company. Its diverse portfolio encompasses assets primarily located in Australia (35%), Canada (34%), Europe (13%), and the United States (11%). The company’s business segments encompass various commodities, including iron ore, aluminum, copper, bauxite, diamonds, uranium, and industrial minerals.

    This meeting between the head of state of Kazakhstan and the Chief Executive Officer of Rio Tinto underscores the mutual interest in fostering fruitful partnerships and capitalizing on the vast potential of Kazakhstan’s mineral resources. It sets the stage for further collaboration and the realization of shared objectives in the realm of sustainable economic development.

  • Kumtor Gold Company is launching a plant for tire restoration and recycling

    Kumtor Gold Company is launching a plant for tire restoration and recycling

    The esteemed “Kumtor Gold Company” has recently inaugurated a state-of-the-art facility in Tokmok, which operates in a trial phase, dedicated to the restoration and recycling of automotive tires. This noteworthy development was graced by the presence of the distinguished Prime Minister, Akylbek Japarov, who paid a visit to this remarkable establishment, as relayed by the press service of the Cabinet of Ministers.

    Under the project entitled “Turning Waste into Money,” the primary objective is to establish a plant that employs advanced German technology, capable of restoring tires of various sizes. By doing so, it aims to reduce the costs associated with tire replacement and enhance the overall efficiency of the esteemed “Kumtor Gold Company.” Simultaneously, this initiative seeks to create new revenue streams while mitigating the adverse environmental impact of plastic waste, as underscored by the Cabinet.

    The transformation process involves the comprehensive processing of old tires, resulting in the creation of novel products, including plastic, textiles, and compressed materials. While the facility presently operates in a trial capacity, plans are underway to commence full-scale operations by the conclusion of 2023 or the advent of 2024. With a workforce of 180 dedicated individuals, the plant possesses an impressive tire processing capacity of over 2 tons per hour. The project necessitated a substantial investment of $19.2 million, with a commendable internal rate of return of 33%.

    Following an extensive examination of the facility’s operations, Prime Minister Japarov expressed his optimism regarding the sale of the produced goods, emphasizing that they will not only be available within Kyrgyzstan but will also be distributed to neighboring nations such as Kazakhstan, Uzbekistan, and Tajikistan. This strategic expansion of market reach demonstrates a forward-thinking approach, presenting lucrative opportunities for both the “Kumtor Gold Company” and the regional economies it serves.

  • Kazakhstan, a land rich in natural resources, is set to put up 12 plots containing rare earth metal deposits for auction

    Kazakhstan, a land rich in natural resources, is set to put up 12 plots containing rare earth metal deposits for auction

    The Department of Subsoil Use of the Ministry of Industry and Construction, under the guidance of Chairman Erlan Akbarov, announced this exciting development. Akbarov clarified that the plots currently do not hold any reserves of rare earth metals. The selection of these plots was based on a comprehensive analysis conducted by the government in 2016, and exploration work is currently underway. Once the exploration is completed, an auction will be held, allowing interested parties to become subsoil users.

    Private companies, supported by state funding, have been responsible for carrying out the exploration work. The 12 plots, including Rzhavaya Sopka, Aktobe Quartz, Kuneoy, Mirolyubovsky, Bokay, Brusilovsky, Kuyrektykol, Khorgos, Kenkuduk, Chulaktau, Keltemshatsky, and Akbulak, are predominantly located in eastern Kazakhstan.

    Akbarov also pointed out that Kazakhstan does not have purely rare metal or rare earth deposits. Instead, these metals are found in combination with other solid minerals. The chairman cited Ahmirovo, Novo-Ahmirovo, and Bakenno as examples of such deposits, where the primary useful mineral is accompanied by secondary rare earth metals.

    The Bakenno rare metal deposit, situated in the Ulan district of the East Kazakhstan region, is expected to resume underground mining operations. The project aims to extract the maximum possible reserves over a 25-year period, with an estimated annual ore processing capacity of 350 thousand tons. The tantalum-rich deposit, located 60 km from Ust-Kamenogorsk, is owned by Dinara Ospanova, Zhalyin Kabiken, and Ayaulym Kasymkhan.

    Another notable rare earth deposit, Novo-Akhmirovo, is located near Ust-Kamenogorsk. CREADA CORPORATION, owned by Erlan Issekesh and Daniar Aubakirov, is engaged in the exploration of this deposit. The company plans to drill eight vertical wells from 2022 to 2026, covering an area of 4.42 square kilometers. The extracted rare metals will be processed at the Ulbinsky Metallurgical Plant, a subsidiary of “Kazatomprom.”

    Furthermore, German company HMS Bergbau AG has expressed a keen interest in lithium mining in Kazakhstan. With an investment of $700 million, they have partnered with a private company to exploit lithium resources at two deposits. This collaboration will enable the Kazakh partner to acquire valuable expertise, and the success of lithium-ion battery production will depend on the availability of lithium resources.

    The European Union is also actively seeking alternative sources of critical materials, including lithium, to reduce its dependence on China. As part of this effort, the EU has entered into an agreement with Kazakhstan, aiming to replace some of its Chinese imports with products from the Republic.

    President Tokayev has emphasized the importance of expanding geological studies in Kazakhstan, particularly in the search for rare and rare-earth metals. The government aims to increase the area of geologically studied land to 2.2 million square kilometers by 2026. Currently, 1.25 million square kilometers are available for subsoil use, and state-funded geological exploration receives an annual budget of approximately 7.5 billion tenge, significantly less than countries like Uzbekistan, Australia, and Canada.

    To facilitate geological research, Kazakhstan has launched the unified subsoil use platform minerals.gov.kz. This platform allows potential investors to access geological reports and submit applications for plots and licenses electronically. The platform initially focuses on uploading secondary geological reports, with the primary reports expected to be digitized and uploaded by 2026. Additionally, the National Geological Service plans to obtain unique geological reports on Kazakhstan’s areas from Rosgeolfond, which were previously sent to Moscow during the Soviet era.

    In light of the decreasing reserves of various solid minerals over the past three decades, the Committee on Geology has proposed measures such as abolishing the value-added tax on geological exploration work and allocating a portion of the mineral extraction tax for state geological exploration.

    Kazakhstan’s commitment to exploring and harnessing its natural resources, particularly rare earth metals, paves the way for economic growth and potential partnerships with international investors.

  • In the span of two years, Uzbekistanis have acquired more than 250 kilograms of gold bars

    In the span of two years, Uzbekistanis have acquired more than 250 kilograms of gold bars

    As per the Central Bank’s report, between 2021 and 2023, a total of 3,550 commemorative gold coins, weighing 72 kilograms in total, were issued for sale. These coins come in weights of 15, 20, and 31.1 grams, and they commemorate various themes. Additionally, 3,900 silver coins, with a total weight of 121 kilograms and a weight of 31.1 grams each, were also made available for purchase.

    The population has shown keen interest in acquiring these commemorative coins for numismatics, collecting, investment, and savings purposes. In fact, 83% of the gold coins, totaling 2,951 pieces, and 99% of the silver coins, totaling 3,864 pieces, were purchased by the public.

    Furthermore, during this period, a significant number of standard gold bars, amounting to 13,130 bars with a total weight of 255 kilograms, were sold to the population through trading points. These bars were primarily sought after by individuals looking to invest in and preserve their wealth.

    As of September 1, the population held the following quantities of each type of bar:

    • 5 grams: 3,793 bars, totaling 19 kilograms
    • 10 grams: 3,854 bars, totaling 39 kilograms
    • 20 grams: 2,545 bars, totaling 51 kilograms
    • 50 grams: 2,938 bars, totaling 147 kilograms

    In terms of the volume of sales for standard gold bars, trading points located in Tashkent have emerged as the leaders among regions. The capital city alone accounted for 9,894 bars, representing 75% of the total bars circulated.

    At present, standard gold bars are available for purchase and resale through 151 trading points across the country. It is worth noting that the Central Bank commenced the sale of commemorative gold and silver coins in 2018, marking the beginning of this successful endeavor.