Aluminum   $ 2.1505 kg        |         Cobalt   $ 33.420 kg        |         Copper   $ 8.2940 kg        |         Gallium   $ 222.80 kg        |         Gold   $ 61736.51 kg        |         Indium   $ 284.50 kg        |         Iridium   $ 144678.36 kg        |         Iron Ore   $ 0.1083 kg        |         Lead   $ 2.1718 kg        |         Lithium   $ 29.821 kg        |         Molybdenum   $ 58.750 kg        |         Neodymium   $ 82.608 kg        |         Nickel   $ 20.616 kg        |         Palladium   $ 40303.53 kg        |         Platinum   $ 30972.89 kg        |         Rhodium   $ 131818.06 kg        |         Ruthenium   $ 14950.10 kg        |         Silver   $ 778.87 kg        |         Steel Rebar   $ 0.5063 kg        |         Tellurium   $ 73.354 kg        |         Tin   $ 25.497 kg        |         Uranium   $ 128.42 kg        |         Zinc   $ 2.3825 kg        |         
Image source: pixelied.com / pixabay.com

АО Qarmet has initiated a significant project to gasify its production processes, as reported on the company’s Telegram channel. The company’s leadership believes that utilizing natural gas will significantly reduce harmful atmospheric emissions and enhance the plant’s economic efficiency. The transition to this eco-friendly energy source has already begun, with completion expected next year. The project will connect the plant’s capacities to the Saryarka gas pipeline, located 25 km from the factory. Qarmet Tubular Products Aktau is manufacturing the required 600 tons of various-sized pipes for the new line. These pipes, made from raw materials supplied directly by the plant, are expected to be delivered to the Temirtau plant by the end of the month.