Aluminum   $ 2.1505 kg        |         Cobalt   $ 33.420 kg        |         Copper   $ 8.2940 kg        |         Gallium   $ 222.80 kg        |         Gold   $ 61736.51 kg        |         Indium   $ 284.50 kg        |         Iridium   $ 144678.36 kg        |         Iron Ore   $ 0.1083 kg        |         Lead   $ 2.1718 kg        |         Lithium   $ 29.821 kg        |         Molybdenum   $ 58.750 kg        |         Neodymium   $ 82.608 kg        |         Nickel   $ 20.616 kg        |         Palladium   $ 40303.53 kg        |         Platinum   $ 30972.89 kg        |         Rhodium   $ 131818.06 kg        |         Ruthenium   $ 14950.10 kg        |         Silver   $ 778.87 kg        |         Steel Rebar   $ 0.5063 kg        |         Tellurium   $ 73.354 kg        |         Tin   $ 25.497 kg        |         Uranium   $ 128.42 kg        |         Zinc   $ 2.3825 kg        |         
Image source: pixelied.com / pixabay.com

Adriatic Metals BiH proudly announced on February 27th, 2024, the successful production of the inaugural ore concentrate within the Vares project in Bosnia and Herzegovina. The Vares ore processing facility is poised to incrementally enhance its capacity in the following months, with a target processing capacity of around 65,000 tons per month expected by the fourth quarter of 2024.

Paul Cronin, the general manager of Adriatic Metals BiH, expressed his satisfaction with the achievement, stating, “I am delighted to announce another significant milestone in the production of the first concentrate within the Vares Project.” He emphasized the utilization of advanced technology in designing and constructing the ore processing plant, with a strong commitment to adhering to the highest health and safety standards. Cronin extended his appreciation to the dedicated team for their diligent efforts.

This milestone signifies a notable success for Adriatic Metals BiH and holds significance for the local community in Vares and the wider state of Bosnia and Herzegovina. The Vares project emerges as one of the most substantial post-war investments in the country, offering considerable economic and social benefits.

Throughout the project, Adriatic Metals BiH has prioritized local employment, collaboration with regional suppliers, engagement with authorities at all levels, and the adoption of state-of-the-art mining technology. This holistic approach not only drives economic growth but also ensures enduring advantages for the Vares community well beyond the mine’s operational lifespan.

Looking to the future, the company aims to further optimize the processing plant and expand underground operations in the ensuing months to achieve the targeted nominal production capacity by the fourth quarter of 2024.

Excerpt: Adriatic Metals BiH celebrates the successful production of the inaugural ore concentrate at the Vares project, marking a significant milestone in Bosnia and Herzegovina’s mining industry.