Aluminum   $ 2.2760 kg        |         Cobalt   $ 26.625 kg        |         Copper   $ 9.0438 kg        |         Gallium   $ 329.01 kg        |         Gold   $ 75748.77 kg        |         Indium   $ 419.06 kg        |         Iridium   $ 151912.28 kg        |         Iron Ore   $ 0.1075 kg        |         Lead   $ 2.0385 kg        |         Lithium   $ 11.844 kg        |         Molybdenum   $ 66.495 kg        |         Neodymium   $ 63.378 kg        |         Nickel   $ 15.817 kg        |         Palladium   $ 28501.64 kg        |         Platinum   $ 30025.58 kg        |         Rhodium   $ 149500.97 kg        |         Ruthenium   $ 13181.81 kg        |         Silver   $ 894.47 kg        |         Steel Rebar   $ 0.4344 kg        |         Tellurium   $ 106.67 kg        |         Tin   $ 29.790 kg        |         Uranium   $ 182.43 kg        |         Zinc   $ 2.6910 kg        |         
Image source: pixelied.com / pixabay.com
Adriatic Metals BiH proudly announced on February 27th, 2024, the successful production of the inaugural ore concentrate within the Vares project in Bosnia and Herzegovina. The Vares ore processing facility is poised to incrementally enhance its capacity in the following months, with a target processing capacity of around 65,000 tons per month expected by the fourth quarter of 2024. Paul Cronin, the general manager of Adriatic Metals BiH, expressed his satisfaction with the achievement, stating, "I am delighted to announce another significant milestone in the production of the first concentrate within the Vares Project." He emphasized the utilization of advanced technology in designing and constructing the ore processing plant, with a strong commitment to adhering to the highest health and safety standards. Cronin extended his appreciation to the dedicated team for their diligent efforts. This milestone signifies a notable success for Adriatic Metals BiH and holds significance fo
Subscribe or log in to read the full content without limitations.