Aluminum   $ 2.1505 kg        |         Cobalt   $ 33.420 kg        |         Copper   $ 8.2940 kg        |         Gallium   $ 222.80 kg        |         Gold   $ 61736.51 kg        |         Indium   $ 284.50 kg        |         Iridium   $ 144678.36 kg        |         Iron Ore   $ 0.1083 kg        |         Lead   $ 2.1718 kg        |         Lithium   $ 29.821 kg        |         Molybdenum   $ 58.750 kg        |         Neodymium   $ 82.608 kg        |         Nickel   $ 20.616 kg        |         Palladium   $ 40303.53 kg        |         Platinum   $ 30972.89 kg        |         Rhodium   $ 131818.06 kg        |         Ruthenium   $ 14950.10 kg        |         Silver   $ 778.87 kg        |         Steel Rebar   $ 0.5063 kg        |         Tellurium   $ 73.354 kg        |         Tin   $ 25.497 kg        |         Uranium   $ 128.42 kg        |         Zinc   $ 2.3825 kg        |         
Image source: pixelied.com / pixabay.com
Anglo Asian Mining, the AIM listed gold, copper, and silver producer focused in Azerbaijan, has announced that drill results confirm a significant quantity of copper mineralisation at Xarxar. The drill results will form part of a forthcoming JORC mineral resource estimate for the Xarxar deposit. In July 2022, an extensive geological exploration programme commenced at the Xarxar deposit, targeting the central copper mineralisation zone. Surface drill holes intercepted significant high-grade and continuous grades of copper mineralisation, with intercepts of continuous copper for up to 380 m. A Joint Ore Reserves Committee (JORC) Mineral Resource Estimate (MRE) is being prepared for the Xarxar deposit and will be published by the end of March 2024. A site visit by the company’s independent geological consultants, Mining Plus UK, was completed in September 2023 as part of the JORC due diligence process. Following the publication of the MRE, further infill and extension drilli
Subscribe or log in to read the full content without limitations.