Aluminum   $ 2.1505 kg        |         Cobalt   $ 33.420 kg        |         Copper   $ 8.2940 kg        |         Gallium   $ 222.80 kg        |         Gold   $ 61736.51 kg        |         Indium   $ 284.50 kg        |         Iridium   $ 144678.36 kg        |         Iron Ore   $ 0.1083 kg        |         Lead   $ 2.1718 kg        |         Lithium   $ 29.821 kg        |         Molybdenum   $ 58.750 kg        |         Neodymium   $ 82.608 kg        |         Nickel   $ 20.616 kg        |         Palladium   $ 40303.53 kg        |         Platinum   $ 30972.89 kg        |         Rhodium   $ 131818.06 kg        |         Ruthenium   $ 14950.10 kg        |         Silver   $ 778.87 kg        |         Steel Rebar   $ 0.5063 kg        |         Tellurium   $ 73.354 kg        |         Tin   $ 25.497 kg        |         Uranium   $ 128.42 kg        |         Zinc   $ 2.3825 kg        |         

Arras Minerals (TSXV: ARK) has stated that results from three drill holes at its Beskauga coppergold project in northeastern Kazakhstan suggest it holds highgrade zones. Diamond drill hole Bg22012 has returned 365 metres grading 0.54grams of gold per tonne, 0.4% copper, 2 grams silver per tonne and 35.3 million parts per million (ppm) molybdenum (0.9%copperequivalent or 1.06 grams goldequivalent) starting from 41 metres downhole, Arras said in a news release on Monday. Drilling at Beskauga continues to deliver nearsurface, broad intervals of significant coppergold mineralisation, Arras CEO Tim Barry said in the release.These grades are indicative of highgrade zones found throughout the deposit which we continue to review as we explore the core of this very extensive system. The 63 sqm project, which is located approximately 300 km eastnortheast of the capital, Astana, is subject to a fouryear optiontopurchase agreement signed in 2020 with private Swiss company Copperbelt AG. The agreement requires Vancouverbased Arras to spend $15 million on exploration over the term before Arras can buy all of Beskauga for an additional $15 million. Hole Bg22012 also included 29 metres grading 0.6gram gold, 0.5% copper, 2.1 grams silver and 31.8 ppm molybdenum (1% copper equivalent or 1.2 grams goldequivalent) from 87 metres downhole. Furthermore, this hole cut 64 metres grading 1.8 grams gold, 1% copper, 4.6 grams silver and 66.5 ppm molybdenum (2.6% copperequivalent or 3.2grams goldequivalent) from 120 metres depth; and30 metres grading 2.95 grams gold, 1.5% copper, 6.2 grams silver and 63.8 ppm molybdenum (4% copperequivalent or 4.8 grams goldequivalent from 120 metres downhole. Additionally, hole Bg21010 outside of the Beskauga main deposit intersectedstrong advanced argillic to argillic alteration and local zones of coppergold mineralisation, which Arras believes is indicative of concealed porphyrystyle mineralisation in the thick volcanosedimentary package that is separated from Beskauga main by a northwest to the southeast fault zone. Arras began a 30,000metre diamond drill program in October 2021, with more assay results expected in the coming months. The Beskauga deposit has an indicated mineral resource of 111.2 million tonnes grading 0.5gram gold per tonne, 0.3% copper and 1.3 grams silver for 1.75 million ounces of contained gold, 333,600 tonnes of copper and 4.79 million ounces of silver. Inferred resources add 92.6 million tonnes grading 0.5 gram gold, 0.2% copper and 1.1gram silver for 1.49 million ounces of contained gold, 222,200 tonnes of copper and 3.39 million ounces of silver. The resource estimate was completed in December 2021.

Beskauga is situated 130 km west of KAZ Minerals Bozshakol porphyrycoppergold mine, one of the countrys largest. Beskauga is near the town of Ekibastuz, which serves the largest coal mine in Kazakhstan and provides a trained workforce for Arras. The project is accessible via a paved road, power lines, a heavy rail line and an irrigation canal, all of which are located within a 25km radius.