Aluminum   $ 2.1505 kg        |         Cobalt   $ 33.420 kg        |         Copper   $ 8.2940 kg        |         Gallium   $ 222.80 kg        |         Gold   $ 61736.51 kg        |         Indium   $ 284.50 kg        |         Iridium   $ 144678.36 kg        |         Iron Ore   $ 0.1083 kg        |         Lead   $ 2.1718 kg        |         Lithium   $ 29.821 kg        |         Molybdenum   $ 58.750 kg        |         Neodymium   $ 82.608 kg        |         Nickel   $ 20.616 kg        |         Palladium   $ 40303.53 kg        |         Platinum   $ 30972.89 kg        |         Rhodium   $ 131818.06 kg        |         Ruthenium   $ 14950.10 kg        |         Silver   $ 778.87 kg        |         Steel Rebar   $ 0.5063 kg        |         Tellurium   $ 73.354 kg        |         Tin   $ 25.497 kg        |         Uranium   $ 128.42 kg        |         Zinc   $ 2.3825 kg        |         

Kazakhstan will switch to a new model of the electricity market from July 1, 2023. I reported about it. O. Energy Minister Bolat Akchulakov, LS reports. He explained that the new model will work on the basis of a single buyer mechanism and a balancing electricity market. According to the head of the department, this will make it possible to meet the medium-term demand for electricity through generation commissioning projects. This includes the modernization of existing power plants. Due to this, more than 1.7 thousand MW will be commissioned by 2027. Also, maneuvering capacities for mo
Subscribe or log in to read the full content without limitations.